Assembly Process
This is a very brief and general overview of the steel frame building assembly process, and will give you a basic idea of the assembly process. Your building will be shipped with a complete set of plans that will show you step by step in detail the process to erect your particular steel building. Support is also provided for any assembly questions or problems you may have during the erection of your building.
View a Slide Show of the assembly process
Delivery of your steel building is handled by factory trained personnel. Delivery personnel undergo several weeks of training at the factory before they are allowed to work with deliveries, this ensures that they are very familiar with all of the components required for each building.
Upon delivery the steel building materials are laid out in the order they will be used, this is referred to as "Shaking Out". Columns and roof beams are laid in position for raising. Girts, Purlins, Columns and Braces are divided according to the frame requirements of each bay. Each part is numbered for quick and easy identification. The delivery personnel will check each item against the shipping list to insure that the correct parts and quantities have been received.
Foundation
Foundation design and construction is the first step in the building process. It is essential that the building foundation meet certain design assumptions and load conditions. This will be determined by the building size, style, and location. All building foundations should be designed in accordance with local city, county, and state codes. Many different foundation designs can accommodate our steel frame building including: Monolithic, Pier, Footer and Gradebeam, and Caissions. Certain basic guidelines and considerations for foundation design are outlined on the anchor bolt drawings furnished with each steel building.
Framing
- Erect main steel frame building columns by fastening them to the anchor bolts embedded in the foundation.
- Lift main rafters, and bolt them to the columns with the supplied bolts.
- Attach wall girts to the columns, by bolting them in place with the supplied bolts.
- Attach roof purlins to the main frame rafters, by bolting them in place with the supplied bolts.
- Attach flange braces to the girts and purlins, by bolting them in place with the supplied bolts.
- Attach cable bracing, with the supplied cable and hardware.
- Frame all door and window openings.
Sheeting
- Place building wall insulation and attach metal sheeting panels to the wall girts with the supplied self tapping screws.
- Place roof insulation and attach roof metal sheeting panels to the roof purlins with the supplied self tapping screws.
- Install doors and windows in the framed openings.
- Install accessories and trim.
Extensive assembly documents, plans and blueprints are provided. All plans are engineer stamped and ready to be submitted to the building department. Bellco Steel Building Systems can be erected using nothing but scaffolding and power hand tools. If you have to cut or drill our frame, you've got the wrong piece! All parts are numbered and guaranteed to fit.